Supplier
Buyer
Help
Apps
Rules

LED tail lamp for new santafe

inquiry

10/pc (MOQ)
FOB Price:
Negotiable | Get Latest Price
Min.Order Quantity:
1 Set / Sets
Supply Ability:
1000 Set / Sets per Month
Port:
shanghai
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal Cash Escrow Other
Delivery Detail:
5 days

Better seismic performance.
The response time faster, traditional light bulb has three tenths glass-shells response of the delay.
Heat is small, light of lamps and lanterns of heat-resistance material request is not very high.
Vehicle control circuit to oxidation.
Beam, more easily, and do not need to use control reflector lamps and reduce the loss
Depth.
Light, high purity, without the chimney filter in the light within 10 nm error.
Power consumption is low, the traditional light bulb reach the same brightness shine, power consumption is only 6% of traditional light bulb,
Save electricity saving.
Long life, no filament structure is calorific, normal use in six years.


 

Contact with Supplier
The CompanyTai zhou Huang yan Wan hao mould factory
The contact未填写
The Address未填写
The Websitehttps://www.alibobo.com/com/taizho204/
Product Categories for this supplier
  • none

LED tail lamp for new santafe

Quantity
0 Piece
Products Cost
inquiry
Area
ChinaZhe Jiang
Tai zhou Huang yan Wan hao mould factory
ChinaZhe Jiang 1Years

Response Rate: High

Avg Response Time: 24–48 h

Business Type: